Contractor Payment Milestone Calculator

Plan a contractor payment schedule that links payments to real site progress, keeps retention, and highlights risky advances or incorrect milestone totals.

Calculator

Use the default milestone percentages or adjust them to match your contract.

Assumptions

Milestones are preliminary owner-protection percentages for residential construction. Retention is held aside until completion or agreed defect-liability conditions.

What This Tool Does Not Include

It does not create a legal contract, certify work quality, measure quantities, or approve contractor claims.

Related Owner Tools

FAQ

Is advance payment always bad?

No, but a high advance increases owner risk before visible site progress.

Why keep retention?

Retention helps protect against incomplete work, defects, and unresolved handover items.

Should milestones total 100%?

Yes. If they do not total 100%, the payment schedule should be corrected before signing.

Estimate Disclaimer

This tool provides a preliminary estimate for planning and discussion only. Local rates, site conditions, design requirements, labor practices, contractor scope, and engineering requirements can vary. Always verify with a qualified professional before making financial, structural, or contractual decisions.